Antioch Sesquicentennial: Rivertown Father’s Day Car Show June 19
Friday, May 27th, 2022


Cull Canyon Swim Complex in Castro Valley. Photo by Jennifer Vanya. Source: EBRPD
All regional parks in the East Bay will be open this Memorial Day for annual holiday gatherings and celebratory festivities. Parks are anticipated to be busy and some at full capacity early, so park staff recommend arriving early to secure first-come, first-served, non-reservable picnic sites.
Many lifeguarded swim areas will also be open for visitors, including Castle Rock Pool at Diablo Foothills in Walnut Creek, Cull Canyon in Castro Valley, Don Castro in Hayward, and Lake Temescal in Oakland. Non-life-guarded beaches include Keller Beach at Miller Knox Regional Park in Richmond and Robert Crown Memorial State Beach in Alameda. Unfortunately, many of the Park District’s most popular swim areas, including Del Valle, Shadow Cliffs, and Lake Anza will be closed due to water quality, low water conditions, or construction and maintenance repairs.
“We regret the inconvenience and limitations on the public’s use of all of our swim facilities,” said Dave Mason, Public Information Supervisor.
Park District swim facilities face ongoing challenges related to climate change, including cyanobacteria (blue-green algae) and low water levels. Water quality is tested regularly during the swim season to ensure it is safe for the public. Visitors should check the status of swim facilities before they go by visiting www.ebparks.org/swimming.
Open Swim Facilities for Memorial Day Weekend are:
Swim areas that are Closed for Memorial Day Weekend are:
UPDATE: Parks Staff Explain Delay in Repairs
Mason and Park District Ward 7 Director Colin Coffey, who represents Antioch, were asked why the Contra Loma Swim Lagoon wasn’t repaired during the off-season so it could be open this summer.
In response, Lisa Goorjian, Chief of Design and Construction said, “it’s important to remember safety is our number one priority. For the lagoon to operate properly, it needs repairs. The delay was two-fold. It’s a complex lagoon. We’ve been working on a waterproofing seal. It’s specialized and it’s been difficult to secure due to the global supply chain issues. It’s been challenging to identify the right product. The lagoon is different than a swimming pool because it has sand. So, it makes it difficult to find something that will work with the sand and not have the seal fail.”
“We’ve been working with our contractor who is working with a supplier to identify the material,” she continued. “The lagoon original material was coming to the end of its life and when we initially made repairs in 2020, we used a new material. The original material is no longer available. We found out our conditions were such that the new material was not successful.”
“We understand that it’s a disappointment and we’re working hard to get it fixed,” Goorjian added. “We are working with our regional partners to provide swimming in eastern Contra Costa County to accommodate swim needs.”
“It is very distressing as Contra Loma is the backyard pool to so many in the area,” Coffey responded. “I asked Lisa to talk to you given she has been overseeing the project. I know it was planned to be completed by swim season. I am hoping we are able to expand hours at another swim facility, like Ambrose, with placement of our lifeguards and covering overhead. Staff is working on that. Have a good holiday weekend.”
Swimming fees vary by facility. However, swimming is free for Regional Parks Foundation members. For information about becoming a Regional Parks Foundation member, visit regionalparksfoundation.org.
Walk-ins for all open locations will be available on a first-come, first-served basis until capacity is reached. Cull Canyon and Don Castro also offer optional swim entry registration on weekends and holidays to guarantee admission. To reserve your all-day swim entry, register at www.bit.ly/3NtZnLk.
The East Bay Regional Park District is the largest regional park system in the nation, comprising 73 parks, 55 miles of shoreline, and over 1,300 miles of trails for hiking, biking, horseback riding, and environmental education. The Park District receives more than 25 million visits annually throughout Alameda and Contra Costa counties in the San Francisco Bay Area.
Allen D. Payton contributed to this report.


Join Us May 21st 10am – 4pm for a Fun Day with Live Music, Food, Free Coal Mine Tours, Performances and Great Exploring! There will be a Free Shuttle from Somersville Towne Center Mall to The Park that Will Allow Free Entry to the Park! Come Join the Fun and Explore One of Antioch’s Most Historic Hidden Gems! The Park is located at 5175 Somersville Road.
Parking is very limited, so we encourage you to use the Free Shuttle. The Shuttle Runs every 20 Minutes with Free Parking from Somersville Towne Center Mall to Black Diamond Mines Regional Park. Somersville Towne Center Mall is Located at 2556 Somersville Road.




Bicycle Garden rendering. Source: City of Antioch
By Allen D. Payton
During their meeting Tuesday night, April 26, 2022, the Antioch City Council voted to postpone a vote on spending $12.3 million over five years to lease a motel for transitional housing for the city’s homeless residents. Mayor Lamar Thorpe spoke of holding a special meeting on the matter, possibly this Friday. The council also unanimously voted to approve up to $550,000 on the proposed Bicycle Garden and locate it at Prewett Family Park. At the end of their meeting, the council on a 2-2-1 split with Thorpe stating he would be abstaining, the formation of the proposed Department of Public Safety and Community Resources was postponed until issues being discussed about the matter in closed session are worked out

The Executive Inn on E. 18th Street is proposed to be used for transitional housing for homeless. Herald file photo.
Homeless Motel Funding Vote Postponed
Following public comments and a history about the project by Thorpe, the council members offered their reasons for how they were going to vote on approving $12.3 million to lease the Executive Inn on E. 18th Street for five years. Executive Inn Homekey Program staff report ACC042622 Executive Inn HomeKey Financing presentation ACC02622
“This is bridge housing for stability,” Thorpe said. “I don’t want people giving out misinformation about our decisions up here. People have told us that we couldn’t. But dammit, we’re doing it.”
Mayor Pro Tem Mike Barbanica said, “I’m in favor of getting people off the street. But I’m not in support of this location.”
“At $2.3 million that’s $82,000 per room per year. We’re only talking about 30 rooms,” he continued.
Barbanica then spoke of the impacts to the shopping center in Pittsburg where the Walmart store is located, since the Motel 6 on Loveridge Road was converted to the Delta Landing transitional housing facility for homeless in East County, and the need for more security there, as a result.
“We’re fooling ourselves if we think there won’t be other impacts in that neighborhood,” he said about the area around the Executive Inn.
District 1 Councilwoman Tamisha Torres-Walker mentioned she lives in the neighborhood near the motel.
“I don’t think having the Executive Inn converted to transitional housing will cause any more problems in that neighborhood,” she said. “If it was good enough to put a school there for children then we can house people there living on the street.” She was speaking of the Rocketship Delta Prep charter school on Cavallo Road.
“I would like to see efforts for beautification and safety in this neighborhood,” Torres-Walker continued. “I do think we should move forward with leasing the Executive Inn. I really want to support the application for HomeKey for the Executive Inn and other potential sites. I do agree this one site is not the end all be all. We do have time. The application doesn’t have to be in until October.”
“It is a topic we’ve been working on for a very long time. I believe that we should have a presentation from Dignity Moves…on other properties,” District 3 Councilwoman Lori Ogorchock said. “I have heard from Focus Strategies that $12.3 million is conservative. So, our reserves will be depleted. The $12.3 doesn’t include services. I’m not in favor of this site. I want to look at other opportunities.”
“The figure $12.2 does include wrap-around services,” Thorpe stated, correcting Ogorchock. “Every budget assumption has us going in the red. Generally, our sales tax does better than we project. So, to look at this number as a fixed number is an assumption.”
District 4 Councilwoman Monica Wilson spoke next saying, “People have said ‘why don’t we have services for homeless?’ We’ve had migration in the Bay Area, east. Services haven’t followed.”
“I’m in agreement we do need to look at other opportunities. But the cutoff date is coming up pretty soon. We shouldn’t leave money on the table,” she continued. “We have a second date coming up. But I don’t want to keep going ‘this isn’t a good site’. Nobody’s going to be 100% happy with any site we choose. I’m saying we should move forward with something, so we don’t leave money on the table. I’m for voting for this tonight so we get the ball rolling and not keep kicking the can down the road.”
“We’re not applying for Round 2 on May 2nd. That would be an impossible effort. We are applying for Round 3 funding…in October,” Thorpe explained.
Assistant City Manager Rosann Bayon Moore spoke about research that she could make available to the council members showing “the Executive Inn is the only site that can compete with the aggressive timeline. As soon as they make their decision in December, we have to show we can bring the units online within eight months.”
“I would have preferred to see that before this and that didn’t happen,” Torres-Walker said, referring to the research by city staff. “I would also like to hear from Dignity Moves and from Home First so we can have a balanced presentation and not just Focus Strategies. Tonight, I cannot support this item without that.”
“So, we need to postpone this,” Thorpe said. “We can’t kick this can down the road. We have to move. We can meet on Friday.”
Torres-Walker then made a motion to postpone the item and Wilson seconded it. “Most votes on homeless have been 3-2 votes,” Thorpe stated. “I keep hearing it’s about this reason or that reason. It’s values. I’m sick and tired of hearing the reasons.”
The motion to postpone then passed 4-1 with Barbanica voting against.

Bicycle Garden concept video screenshot. Source: City of Antioch
Bicycle Garden Design Funding & Location Approved
Antioch Parks and Recreation Director Brad Helfenberger provided a presentation on the proposed Bicycle Garden and said the Contra Costa Transportation Authority would be the lead agency on the project. Bicycle Garden staff report & presentation ACC042622
During discussion about the Bicycle Park, the council chose the location of Prewett Family Park for the Bicycle Garden and to spend up to $550,000 for planning and design by San Francisco-based T.Y. Lin International, the global civil and structural infrastructure engineering firm that designed the Eastern Span of the San Francisco-Oakland Bay Bridge. The funds are not currently in the budget but will be spent from the General Fund.
Council members were then asked their top two preferred locations. Torres-Walker and Barbanica supported Gentrytown Park as their first choice and Prewett Family Park as their second for the location. But Ogorchock, Wilson and Thorpe supported Prewett as their first choice and Gentrytown as their second choice.
“So, Prewett moves forward,” Thorpe said.
The council then approved the expenditure and location on a 5-0 vote.

Proposed organizational chart for new city department. Source: City of Antioch
Formation of New Department Also Postponed
The council then discussed the formation of the proposed Department of Public Safety and Community Resources. (See related articles here and here) New department formation staff report ACC042622
Ogorchock asked to change the name to Public Services.
“As one of the committee members, of course I’m in support of this,” Wilson said.
“I would like to see this come back and have staff develop a policy on the Department of Public Safety and Community Resources,” Torres-Walker said. She also wanted the director’s position included in the ordinance.
“Not including it doesn’t mean you can’t hire one,” City Attorney Thomas L. Smith stated.
“Do we normally include the positions in an ordinance?” Thorpe asked.
“Sometimes we include the top positions. You don’t have to. You can leave it out.” Smith responded.
“I don’t think it needs to be in the ordinance. Staff needs flexibility. I think that’s too much,” Thorpe stated.
“If it doesn’t have to come back in the ordinance and can come back another way, through the budget, I’m fine with that,” Torres-Walker said.

Proposed staffing chart for new city department. Source: City of Antioch
“I get what the mayor is saying. I’m happy to move this process forward,” Wilson said.
“So, everyone is in support of moving this forward?” Thorpe asked.
“I’ve been consistent ‘no’ on this,” Barbanica said.
“So, is that three in favor and two opposed?” Smith asked.
Thorpe said he was going to abstain.
“Should I bring the ordinance back?” Smith asked.
“We’ve been having these discussions in closed session. I’d prefer to get some of that worked out, first then bring it back,” Thorpe said.
So, the formation of the new department was postponed until an unspecified time in the future.