Highway 4 full freeway closures between Loveridge and Somersville Roads

As part of the Highway 4 construction work, the contractor will be performing various activities on the new concrete pavement. In order to ensure crew and public safety during this work, the contractor will close all lanes of eastbound Highway 4 between Loveridge Road and Somersville Road/Auto Center Drive on Tuesday morning, October 1, from 1:00 am to 5:00 am.

The detour for this work will be as follows:

o Eastbound motorists will be directed off the highway at Loveridge Road, right on Loveridge Road, left on E. Leland Road, becomes Delta Fair Boulevard, left on Somersville Road, and right onto the eastbound Highway 4 on-ramp from Somersville Road/Auto Center Drive. For detour map, please see attachment.

The contractor will close all lanes of eastbound Highway 4 between Somersville Road/Auto Center Drive and Lone Tree Way/A Street on Tuesday through Thursday evenings, October 1-3, from 11:59 pm to 5:00 am, and if necessary, Saturday morning, October 5, from 1:00 am to 6:00 am.

The detour for this work will be as follows:

o Eastbound motorists will be directed off the highway at Somersville Road/Auto Center Drive, right on Somersville Road, left on Delta Fair Boulevard, left on Buchanan Road, becomes Fitzuren Road, right on G Street, left on Putnam Street, left on Lone Tree Way, and right onto the eastbound Highway 4 on-ramp from Lone Tree Way/A Street. For detour map, please see attachment.

The contractor will close all lanes of westbound Highway 4 between Lone Tree Way/A Street and Contra Loma Boulevard/L Street on Tuesday through Thursday evenings, October 1-3, from 10:00 pm to 4:00 am, and if necessary, Saturday morning, October 5, from 1:00 am to 5:00 am.

The detour for this work will be as follows – See the detour maps by clicking here HIGHWAY 4 TRAFFIC ADVISORY FULL CLOSURES OCT 1-5 2013

o Westbound motorists will be directed off the highway at Lone Tree Way/A Street, right on A Street, left on W. 18th Street, left on L Street, and right onto the westbound Highway 4 on-ramp from Contra Loma Boulevard/L Street. For detour map, please see attachment.

The Highway 4 projects include improvements to the entire project corridor that will help revitalize eastern Contra Costa County. The projects expand Highway 4 from four to eight lanes between Loveridge Road and SR-160, and add a BART extension from Pittsburg to Antioch (eBART). The projects will also expand the highway from two to

four lanes from Lone Tree Way to Sand Creek Road. This will greatly improve transit accessibility for the region and help reduce traffic congestion and enhance the quality of life for the more than 250,000 residents of eastern Contra Costa County. The projects have been carefully staged to keep 130,000 vehicles per day moving as major construction and demolition work continue, and include over $1.3 billion in State, Federal, Regional Bridge Toll, and Contra Costa Measures C & J sales tax funds.

Caltrans and CCTA appreciate your patience as we work to improve the highways. For the most current information on all Highway 4 corridor closures please visit our website at: http://4eastcounty.org.


the attachments to this post:

HIGHWAY 4 TRAFFIC ADVISORY FULL CLOSURES OCT 1-5 2013
HIGHWAY 4 TRAFFIC ADVISORY FULL CLOSURES OCT 1-5 2013


No Comments so far.

Leave a Reply